A customer has a data center with applications running on 16 volumes that are presented from a Dell Unity XT
system. They want to design a DR site within metro distance with zero RPO using storage-based replication.
According to Dell best practices, which design approach minimizes the impact on storage performance?
For a PowerStore 3200T running Block Workloads, which two options does Sizer take into consideration to
equate the performance for each workload? (Select 2)
What is recommended maximum cable length for PowerStore back-end NVMe cabling to avoid performance
issues?
Which path of the sizer tool for Dell Unity XT uses predefined configurations that are based on array model,
capacity points, random workloads, RAID type, and drive type?
© Copyrights Dumpscity 2025. All Rights Reserved
We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the Dumpscity.