×

Special Offer! November Sale at DumpsCity! Get 20% Off on All Certification Exam Questions. Use Code: DC20OFF

Free Test Prep CCE-CCC Exam Questions

Try our Free Demo Practice Tests for Comprehensive CCE-CCC Exam Preparation

  • Test Prep CCE-CCC Exam Questions
  • Provided By: Test Prep
  • Exam: Certified Cost Consultant / Cost Engineer (AACE International)
  • Certification: AACE
  • Total Questions: 118
  • Updated On: Nov 20, 2024
  • Rated: 4.9 |
  • Online Users: 236
Page No. 1 of 24
Add To Cart
  • Question 1
    • A major theme park is expanding the existing facility over a five-year period. The design phase will be
      completed one year after the contract is awarded. Major engineering drawings will be finalized two years after
      the design contract is awarded and construction will begin three years after the award of the design contract.
      New, unique ride technology will be used and an estimate will need to be developed to identify these costs that
      have no historical data.
      A cyclical process model was chosen as the basis for total cost management (TCM) because:

      Answer: C
  • Question 2
    • A major theme park is expanding the existing facility over a five-year period. The design phase will be
      completed one year after the contract is awarded. Major engineering drawings will be finalized two years after
      the design contract is awarded and construction will begin three years after the award of the design contract.
      New, unique ride technology will be used and an estimate will need to be developed to identify these costs that
      have no historical data.
      Cost engineers who feel completely satisfied and fulfilled by their work as part of a project team are said to
      have reached the ______________ stage of Maslow's hierarchy of needs.

      Answer: C
PAGE: 1 - 24
Add To Cart

© Copyrights Dumpscity 2024. All Rights Reserved

We use cookies to ensure your best experience. So we hope you are happy to receive all cookies on the Dumpscity.